Skip navigation.

Translation of the letter sent by the ASN (Nuclear Safety Authority) to the Director of Development of the Flamanville 3 EPR-type reactor, regarding an inspection of the construction site that took place on 8 February 2008.

Download Document

Authors:
Date published: 23 April 2008
Format: Adobe PDF
Number of pages: 6
ISBN:
Size: 87 Kb