Translation of the letter sent by the ASN (Nuclear Safety Authority) to the Director of Development of the Flamanville 3 EPR-type reactor, regarding an inspection of the construction site that took place on 3 and 4 December 2007.
Download Document
| Authors: |
|
| Date published: |
23 April 2008 |
| Format: |
Adobe PDF
|
| Number of pages: |
|
| ISBN: |
|
| Size: |
174 Kb |