Greenpeace today released a report that emphasises no need for capacity addition of electricity generation through thermal power plants in Maharashtra. The current shortage in the state can be easily met through energy efficiency and reduction of transmission and distribution losses without adding a single climate-threatening megawatt to meet growing demand.

Greenpeace today released a report that emphasises no need for capacity addition of electricity generation through thermal power plants in Maharashtra. The current shortage in the state can be easily met through energy efficiency and reduction of transmission and distribution losses without adding a single climate-threatening megawatt to meet growing demand.