{"id":366,"date":"2017-07-07T00:00:00","date_gmt":"2017-07-07T00:00:00","guid":{"rendered":"https:\/\/www.greenpeace.org\/canada\/non-classifiee\/366\/reaction-desjardins-decrete-un-moratoire-sur-tout-projet-dinvestissement-ou-de-financement-doleoducs\/"},"modified":"2019-11-06T03:29:32","modified_gmt":"2019-11-06T08:29:32","slug":"reaction-desjardins-decrete-un-moratoire-sur-tout-projet-dinvestissement-ou-de-financement-doleoducs","status":"publish","type":"post","link":"https:\/\/www.greenpeace.org\/canada\/fr\/blog-des-volontaires\/366\/reaction-desjardins-decrete-un-moratoire-sur-tout-projet-dinvestissement-ou-de-financement-doleoducs\/","title":{"rendered":"R\u00c9ACTION &#8211; Desjardins d\u00e9cr\u00e8te un moratoire sur \u201ctout projet d\u2019investissement ou de financement d\u2019ol\u00e9oducs\u201d"},"content":{"rendered":"<div>\n<p><strong>Le 8 j<span id=\"docs-internal-guid-5d67181f-1fd2-6173-1ae9-afd020df492f\"><span>uillet 2017 (MONTR\u00c9AL)<\/span><\/span><\/strong><span id=\"docs-internal-guid-5d67181f-1fd2-6173-1ae9-afd020df492f\"> <\/span>\u2013 En r\u00e9action \u00e0 <a title=\"Desjardins finance Trans Mountain avant de d\u00e9cr\u00e9ter un moratoire sur les projets de pipeline\" href=\"http:\/\/www.ledevoir.com\/environnement\/actualites-sur-l-environnement\/502985\/desjardins-et-le-petrole\" target=\"_blank\" rel=\"noopener noreferrer\">l\u2019annonce<\/a> du Mouvement Desjardins qui a d\u00e9cr\u00e9t\u00e9 un moratoire sur \u201ctout projet d\u2019investissement ou de financement d\u2019ol\u00e9oducs\u201d, Patrick Bonin, responsable de la campagne Climat et \u00c9nergie chez Greenpeace Canada a d\u00e9clar\u00e9:<\/p>\n<p>\u201cCette d\u00e9cision montre que les institutions financi\u00e8res astucieuses se m\u00e9fient de plus en plus du financement des projets de combustibles fossiles. Les pipelines de sables bitumineux posent des risques majeurs, que l\u2019on soit pr\u00e9occup\u00e9 par les rendements financiers, les droits humains ou l&rsquo;environnement, ou les trois. Desjardins a pris la bonne d\u00e9cision en annon\u00e7ant un moratoire sur tout projet d\u2019investissement ou de financement d\u2019ol\u00e9oducs et nous souhaitons qu\u2019il devienne rapidement permanent.\u201d<\/p>\n<p><span>Greenpeace a \u00e9t\u00e9 en communication avec Desjardins qu\u2019elle a d\u2019ailleurs rencontr\u00e9 cette semaine pour discuter de son financement des pipelines, lui demandant de ne pas financer les controvers\u00e9s projets de pipelines de sables bitumineux. Greenpeace esp\u00e8re voir Desjardins suivre les prochaines \u00e9tapes logiques, soit la vente de sa participation existante de 145 millions de dollars du total des $5,5 milliards que Kinder Morgan a su obtenir afin de financer le projet Trans Mountain ainsi que l\u2019officialisation rapide que ce moratoire sera permanent.<\/span><br \/>\nIl faut souligner que l\u2019annonce de Desjardins survient dans la foul\u00e9e d\u2019autres institutions, \u00e0 commencer par le plus important fonds de pension su\u00e9dois, l&rsquo;AP7, \u00a0qui a <a title=\"Sweden\u2019s Largest Pension Divests From Paris Accord Violators, Including ExxonMobil &amp; TransCanada\" href=\"https:\/\/cleantechnica.com\/2017\/06\/19\/swedens-largest-pension-divests-paris-accord-violators-inc-exxonmobil-transcanada\/\" target=\"_blank\" rel=\"noopener noreferrer\">annonc\u00e9 <\/a>qu&rsquo;il exclut d\u00e9sormais TransCanada de ses investissements en raison du fait que les pipelines qu\u2019elle propose sont incompatibles avec l&rsquo;Accord de Paris; suivie de celle de la banque n\u00e9erlandaise ING qui a publiquement annonc\u00e9 en juin, qu&rsquo;elle ne financerait plus les projets de pipelines de p\u00e9trole des sables bitumineux canadiens, y compris Trans Mountain (Kinder Morgan), Keystone XL et \u00c9nergie Est (TransCanada) ainsi que la Ligne 3 (Enbridge). En avril dernier, la banque U.S. bank est devenue la <a href=\"https:\/\/www.ecowatch.com\/us-bank-divest-pipelines-2408440397.html\"><span>premi\u00e8re<\/span><\/a> grande banque aux \u00c9tats-Unis \u00e0 exclure formellement les pipelines de p\u00e9trole et de gaz du financement de leur projet.<br \/>\nAuparavant, et suite \u00e0 la r\u00e9sistance des Sioux de Standing Rock, des banques mondiales \u00a0se sont \u00a0retir\u00e9es du financement du pipeline Dakota Access. Une <a title=\"It is our Standing Rock\" href=\"http:\/\/www.cbc.ca\/news\/canada\/british-columbia\/first-nations-legal-action-federal-government-kinder-morgan-1.3939441\" target=\"_blank\" rel=\"noopener noreferrer\">opposition similaire<\/a> sera au rendez-vous si Kinder Morgan, d\u00e9marre la construction de son pipeline en septembre tel qu\u2019elle pr\u00e9voit le faire.<span class=\"Apple-tab-span\"> <\/span><br \/>\n<span>Un<\/span><a href=\"https:\/\/www.greenpeace.org\/static\/planet4-canada-stateless\/2018\/06\/Banking_On_Climate_Change_2017.pdf\"><span> rapport<\/span><\/a><span> publi\u00e9 en 2017 explique que le financement des projets de combustibles fossiles englobant trente-sept banques mondiales a chut\u00e9 de 22% en 2016.<\/span><\/p>\n<p style=\"text-align: center;\" dir=\"ltr\"><span>-30-<\/span><\/p>\n<p><strong>Contact:<\/strong><\/p>\n<p dir=\"ltr\"><span>Loujain Kurdi, \u00a0Conseill\u00e8re en communications, (514)\u00a0<\/span>577-6657, loujain.kurdi@greenpeace.org <\/p>\n<p><script type=\"text\/javascript\"><!--\ndocument.write(dc('Eoi_1', '13_74_61_7C_3D_76_70_72_76_63_7D_76_76_61_74_53_7A_77_61_66_78_3D_7D_7A_72_79_66_7C_7F'));\/\/--><\/script>.\u00a0<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Le 8 juillet 2017 (MONTR\u00c9AL) \u2013 En r\u00e9action \u00e0 l\u2019annonce du Mouvement Desjardins qui a d\u00e9cr\u00e9t\u00e9 un moratoire sur \u201ctout projet d\u2019investissement ou de financement d\u2019ol\u00e9oducs\u201d, Patrick Bonin, responsable de&hellip;<\/p>\n","protected":false},"author":12,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"ep_exclude_from_search":false,"p4_og_title":"","p4_og_description":"","p4_og_image":"","p4_og_image_id":"","p4_seo_canonical_url":"","p4_campaign_name":"","p4_local_project":"","p4_basket_name":"","p4_department":"","footnotes":""},"categories":[20],"tags":[47],"p4-page-type":[],"class_list":["post-366","post","type-post","status-publish","format-standard","hentry","category-climat","tag-petrole"],"_links":{"self":[{"href":"https:\/\/www.greenpeace.org\/canada\/fr\/wp-json\/wp\/v2\/posts\/366","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.greenpeace.org\/canada\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.greenpeace.org\/canada\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.greenpeace.org\/canada\/fr\/wp-json\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"https:\/\/www.greenpeace.org\/canada\/fr\/wp-json\/wp\/v2\/comments?post=366"}],"version-history":[{"count":2,"href":"https:\/\/www.greenpeace.org\/canada\/fr\/wp-json\/wp\/v2\/posts\/366\/revisions"}],"predecessor-version":[{"id":27102,"href":"https:\/\/www.greenpeace.org\/canada\/fr\/wp-json\/wp\/v2\/posts\/366\/revisions\/27102"}],"wp:attachment":[{"href":"https:\/\/www.greenpeace.org\/canada\/fr\/wp-json\/wp\/v2\/media?parent=366"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.greenpeace.org\/canada\/fr\/wp-json\/wp\/v2\/categories?post=366"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.greenpeace.org\/canada\/fr\/wp-json\/wp\/v2\/tags?post=366"},{"taxonomy":"p4-page-type","embeddable":true,"href":"https:\/\/www.greenpeace.org\/canada\/fr\/wp-json\/wp\/v2\/p4-page-type?post=366"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}