{"id":6444,"date":"2020-04-29T09:53:00","date_gmt":"2020-04-29T07:53:00","guid":{"rendered":"https:\/\/www.greenpeace.org\/czech\/?p=6444"},"modified":"2020-04-29T21:10:47","modified_gmt":"2020-04-29T19:10:47","slug":"na-dole-turow-se-od-patku-tezi-ilegalne-nove-povoleni-ignoruje-ceskou-vladu-mistni-lidi-i-legislativu-eu","status":"publish","type":"post","link":"https:\/\/www.greenpeace.org\/czech\/clanek\/6444\/na-dole-turow-se-od-patku-tezi-ilegalne-nove-povoleni-ignoruje-ceskou-vladu-mistni-lidi-i-legislativu-eu\/","title":{"rendered":"Na dole Tur\u00f3w se od p\u00e1tku t\u011b\u017e\u00ed ileg\u00e1ln\u011b. Nov\u00e9 povolen\u00ed ignoruje \u010deskou vl\u00e1du, m\u00edstn\u00ed lidi i legislativu EU"},"content":{"rendered":"\n<p><strong>U\u017e ve \u010dtvrtek kon\u010d\u00ed spole\u010dnosti PGE p\u016fvodn\u00ed povolen\u00ed k t\u011b\u017eb\u011b na dole Tur\u00f3w, kter\u00fd se nach\u00e1z\u00ed p\u0159\u00edmo na \u010desko-polsko-n\u011bmeck\u00e9 hranici a kter\u00fd u\u017e nyn\u00ed krade vodu lidem na \u010desk\u00e9 stran\u011b. Od 1. kv\u011btna se za\u010dne t\u011b\u017eit podle povolen\u00ed, kter\u00e9 je ve z\u0159ejm\u00e9m rozporu s evropskou legislativou, t\u011b\u017eba tedy bude ileg\u00e1ln\u00ed. <\/strong><\/p>\n\n<p>V p\u0159\u00edpad\u011b roz\u0161\u00ed\u0159en\u00ed a prohlouben\u00ed dolu hroz\u00ed ztr\u00e1ta vody a\u017e 30 tis\u00edc\u016fm lidem v Libereck\u00e9m kraji. T\u011b\u017eba a spalov\u00e1n\u00ed uhl\u00ed d\u00e1le zp\u016fsobuj\u00ed tak\u00e9 zne\u010di\u0161t\u011bn\u00ed ovzdu\u0161\u00ed, hluk a prohlubov\u00e1n\u00ed klimatick\u00e9 krize. P\u0159esto\u017ee n\u011bkolik m\u011bs\u00edc\u016f b\u011b\u017eel p\u0159eshrani\u010dn\u00ed proces vyhodnocen\u00ed vliv\u016f na \u017eivotn\u00ed prost\u0159ed\u00ed (tzv. EIA) k projektu t\u011b\u017eby na 24 let, p\u0159ed jeho dokon\u010den\u00edm firma PGE po\u017e\u00e1dala o povolen\u00ed t\u011b\u017eby na 6 let, p\u0159i\u010dem\u017e tento konkr\u00e9tn\u00ed projekt nikde nep\u0159edstavila a vliv na \u017eivotn\u00ed prost\u0159ed\u00ed v n\u011bm vyhodnocen nen\u00ed. Nap\u0159\u00edklad se nev\u00ed, kde p\u0159esn\u011b firma bude t\u011b\u017eit a jak\u00fd to bude m\u00edt vliv na \u010desk\u00e9 ob\u010dany.&nbsp;<\/p>\n\n<figure class=\"wp-block-image size-large  caption-style-blue-overlay caption-alignment-center\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"647\" src=\"https:\/\/www.greenpeace.org\/static\/planet4-czech-republic-stateless\/2019\/10\/c594bd30-2019_05_26_gp_turow_zewlakk-3031-1024x647.jpg\" alt=\"\" class=\"wp-image-4296\" srcset=\"https:\/\/www.greenpeace.org\/static\/planet4-czech-republic-stateless\/2019\/10\/c594bd30-2019_05_26_gp_turow_zewlakk-3031-1024x647.jpg 1024w, https:\/\/www.greenpeace.org\/static\/planet4-czech-republic-stateless\/2019\/10\/c594bd30-2019_05_26_gp_turow_zewlakk-3031-300x190.jpg 300w, https:\/\/www.greenpeace.org\/static\/planet4-czech-republic-stateless\/2019\/10\/c594bd30-2019_05_26_gp_turow_zewlakk-3031-768x486.jpg 768w, https:\/\/www.greenpeace.org\/static\/planet4-czech-republic-stateless\/2019\/10\/c594bd30-2019_05_26_gp_turow_zewlakk-3031-510x322.jpg 510w, https:\/\/www.greenpeace.org\/static\/planet4-czech-republic-stateless\/2019\/10\/c594bd30-2019_05_26_gp_turow_zewlakk-3031.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption>D\u016fl Tur\u00f3w<div class=\"credit icon-left\"> \u00a9 (c) Greenpeace &#8211; Petr Zewlakk Vrabec<\/div><\/figcaption><\/figure>\n\n<p>Proces povolov\u00e1n\u00ed t\u011b\u017eby byl nav\u00edc zcela neve\u0159ejn\u00fd, nemohli se ho \u00fa\u010dastnit ani ob\u010dan\u00e9, ani spolky, ani samospr\u00e1vy a dot\u010den\u00e9 st\u00e1ty &#8211; \u010cesko a N\u011bmecko. Dodnes nebylo rozhodnut\u00ed nikde zve\u0159ejn\u011bno a v\u0161echny na\u0161e informace o n\u011bm jsou proto zprost\u0159edkovan\u00e9 m\u00e9dii nebo firmou PGE. \u010cesk\u00e1 pobo\u010dka Greenpeace proto podala st\u00ed\u017enost k soudu na omezen\u00ed \u00fa\u010dasti v procesu a na skute\u010dnost, \u017ee neexistuje rozhodnut\u00ed EIA k projektu, kter\u00fd vedl k povolen\u00ed t\u011b\u017eby.<\/p>\n\n<p>Organizace Greenpeace kv\u016fli tomu ji\u017e p\u0159ed \u010dasem vyzvala otev\u0159en\u00fdm dopisem ministra \u017eivotn\u00edho prost\u0159ed\u00ed Richarda Brabce a \u010deskou vl\u00e1du, aby <a href=\"https:\/\/www.greenpeace.org\/czech\/tiskova-zprava\/6166\/organizace-greenpeace-vyzvala-vladu-aby-zazalovala-polsko-kvuli-rozsirovani-kontroverzniho-dolu-turow\/\">polskou stranu za jej\u00ed nestandardn\u00ed postup za\u017ealovali u Evropsk\u00e9ho soudn\u00edho dvoru<\/a>. Stejn\u00fd <a href=\"https:\/\/www.novinky.cz\/ekonomika\/clanek\/zalujte-polsko-kvuli-turowu-zada-po-vlade-liberecky-kraj-40321975\">po\u017eadavek m\u00e1 na vl\u00e1du i Libereck\u00fd kraj<\/a>. Dnes problematiku Tur\u00f3wa projedn\u00e1valy i V\u00fdbor pro \u017eivotn\u00ed prost\u0159ed\u00ed a V\u00fdbor pro evropsk\u00e9 z\u00e1le\u017eitosti v r\u00e1mci Poslaneck\u00e9 sn\u011bmovny. Oba cht\u011bj\u00ed, aby ministerstvo zahrani\u010dn\u00edch v\u011bc\u00ed vypracovalo pr\u00e1vn\u00ed anal\u00fdzu pro pod\u00e1n\u00ed \u017ealoby.<\/p>\n\n<p>Ministerstvo \u017eivotn\u00edho prost\u0159ed\u00ed se zat\u00edm k mo\u017enosti pod\u00e1n\u00ed \u017ealoby nevyj\u00e1d\u0159ilo. V minulosti ministr Brabec <a href=\"https:\/\/liberec.rozhlas.cz\/polsko-prodlouzilo-tezebni-licenci-pro-dul-turow-8171315\">\u0159\u00edkal, \u017ee \u017ealobu na Polsko by m\u011bla podat Evropsk\u00e1 komise<\/a>, ta je ale v\u00e1z\u00e1na dlouh\u00fdmi procesn\u00edmi lh\u016ftami. V obdobn\u00e9m p\u0159\u00edpad\u011b, kdy Polsko ileg\u00e1ln\u011b k\u00e1celo stromy v B\u011blov\u011b\u017esk\u00e9m pralese, <a href=\"https:\/\/ec.europa.eu\/commission\/presscorner\/detail\/en\/IP_17_1948\">trval tento proces zhruba 14 m\u011bs\u00edc\u016f<\/a>. \u017daloba \u010desk\u00e9ho st\u00e1tu oproti tomu m\u016f\u017ee b\u00fdt efektivn\u00edm a rychl\u00fdm zp\u016fsobem, jak h\u00e1jit pr\u00e1va m\u00edstn\u00edch lid\u00ed, nap\u0159\u00edklad d\u00edky vyd\u00e1n\u00ed p\u0159edb\u011b\u017en\u00e9ho opat\u0159en\u00ed soudu, kter\u00e9 by zastavilo t\u011b\u017ebu.<\/p>\n\n<p><strong>Milan Starec, obyvatel vesnice Uheln\u00e1 a \u010dlen Sousedsk\u00e9ho spolku Uheln\u00e1, \u0159\u00edk\u00e1:<\/strong><br>\u201c<em>Sou\u010dasn\u00fd stav je pro n\u00e1s naprosto nep\u0159ijateln\u00fd. Polsko p\u0159estalo hr\u00e1t podle pravidel a vydalo rozhodnut\u00ed bez ohledu na legislativu i obyvatele. Doslova ka\u0161le na ve\u0161ker\u00e9 negativn\u00ed d\u016fsledky, kter\u00e9 bude dal\u0161\u00ed t\u011b\u017eba m\u00edt. Kv\u016fli vyd\u00e1n\u00ed \u0161estilet\u00e9ho prodlou\u017een\u00ed t\u011b\u017eebn\u00ed licence v podivn\u00e9m postrann\u00edm \u0159\u00edzen\u00ed te\u010f ani nev\u00edme, zda v\u016fbec bude postupovat tak, jak tvrdila v dokumentaci k procesu EIA. Nev\u00edme, jestli bude vybudov\u00e1na protifiltra\u010dn\u00ed clona. Nev\u00edme, jestli bude vybudov\u00e1n val sm\u011brem k na\u0161\u00ed obci. Nev\u00edme ani ty nejz\u00e1kladn\u011bj\u0161\u00ed a nejpodstatn\u011bj\u0161\u00ed informace. Pokud toto ministr Brabec nevid\u00ed jako d\u016fvod k \u017ealob\u011b, pak skute\u010dn\u011b nev\u00edm, co by j\u00edm m\u011blo b\u00fdt.\u201c<\/em><\/p>\n\n<p><strong>Nikol Krej\u010dov\u00e1, koordin\u00e1torka uheln\u00e9 kampan\u011b Greenpeace \u010cR, \u0159\u00edk\u00e1:<\/strong><em>&nbsp;<\/em><br><em>\u201cDouf\u00e1me, \u017ee \u010desk\u00e1 vl\u00e1da za\u017ealuje Polsko, a to neodkladn\u011b. Vn\u00edm\u00e1me velmi negativn\u011b, \u017ee se vl\u00e1da ji\u017e m\u011bs\u00edce tv\u00e1\u0159\u00ed, \u017ee probl\u00e9m neexistuje a \u010dek\u00e1, jestli se \u0159e\u0161en\u00ed n\u00e1hodou neujme Evropsk\u00e1 komise. Nezn\u00e1me ani komunikaci vl\u00e1dy s Evropskou komis\u00ed, proto\u017ee Ministerstvo \u017eivotn\u00edho prost\u0159ed\u00ed nikdy nezve\u0159ejnilo konkr\u00e9tn\u00ed kroky, kter\u00e9 podniklo. Ji\u017e m\u011bs\u00edc tak\u00e9 \u010dek\u00e1me na odpov\u011b\u010f ministra Brabce na n\u00e1\u0161 dopis. Takto si h\u00e1jen\u00ed pr\u00e1v \u010desk\u00fdch ob\u010dan\u016f, kter\u00e9 vl\u00e1da a jej\u00ed \u010dlenov\u00e9 deklarovali, nep\u0159edstavujeme. Rychlej\u0161\u00ed a jist\u011bj\u0161\u00ed ne\u017e \u010dekat na prob\u011bhnut\u00ed cel\u00e9ho procesu Evropsk\u00e9 komise je p\u0159itom p\u0159\u00edm\u00e1 \u017ealoba \u010desk\u00e9ho st\u00e1tu na Polsko. Vl\u00e1da te\u010f mus\u00ed jednat, nebot ka\u017ed\u00e9 zpo\u017ed\u011bn\u00ed umo\u017e\u0148uje posun t\u011b\u017eby bl\u00ed\u017ee \u010desk\u00fdm hranic\u00edm, kv\u016fli kter\u00e9mu hroz\u00ed v\u011bt\u0161\u00ed negativn\u00ed vlivy na \u010desk\u00e9 obyvatele, v\u010detn\u011b ztr\u00e1ty vody. \u017daloba \u010desk\u00e9ho st\u00e1tu proti Polsku je jasn\u00fdm a rychl\u00fdm \u0159e\u0161en\u00edm, kter\u00e9 dlouh\u00e9 jedn\u00e1n\u00ed Evropsk\u00e9 komise nem\u016f\u017ee nahradit.\u201d<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>U\u017e ve \u010dtvrtek kon\u010d\u00ed spole\u010dnosti PGE p\u016fvodn\u00ed povolen\u00ed k t\u011b\u017eb\u011b na dole Tur\u00f3w, kter\u00fd se nach\u00e1z\u00ed p\u0159\u00edmo na \u010desko-polsko-n\u011bmeck\u00e9 hranici a kter\u00fd u\u017e nyn\u00ed krade vodu lidem na \u010desk\u00e9 stran\u011b.&hellip;<\/p>\n","protected":false},"author":27,"featured_media":4296,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ep_exclude_from_search":false,"p4_og_title":"","p4_og_description":"","p4_og_image":"","p4_og_image_id":"","p4_seo_canonical_url":"","p4_campaign_name":"not set","p4_local_project":"not set","p4_basket_name":"not set","p4_department":"","footnotes":""},"categories":[4],"tags":[25],"p4-page-type":[16],"class_list":["post-6444","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energeticka-revoluce","tag-konec-doby-fosilni","p4-page-type-clanek"],"_links":{"self":[{"href":"https:\/\/www.greenpeace.org\/czech\/wp-json\/wp\/v2\/posts\/6444","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.greenpeace.org\/czech\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.greenpeace.org\/czech\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.greenpeace.org\/czech\/wp-json\/wp\/v2\/users\/27"}],"replies":[{"embeddable":true,"href":"https:\/\/www.greenpeace.org\/czech\/wp-json\/wp\/v2\/comments?post=6444"}],"version-history":[{"count":3,"href":"https:\/\/www.greenpeace.org\/czech\/wp-json\/wp\/v2\/posts\/6444\/revisions"}],"predecessor-version":[{"id":10383,"href":"https:\/\/www.greenpeace.org\/czech\/wp-json\/wp\/v2\/posts\/6444\/revisions\/10383"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.greenpeace.org\/czech\/wp-json\/wp\/v2\/media\/4296"}],"wp:attachment":[{"href":"https:\/\/www.greenpeace.org\/czech\/wp-json\/wp\/v2\/media?parent=6444"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.greenpeace.org\/czech\/wp-json\/wp\/v2\/categories?post=6444"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.greenpeace.org\/czech\/wp-json\/wp\/v2\/tags?post=6444"},{"taxonomy":"p4-page-type","embeddable":true,"href":"https:\/\/www.greenpeace.org\/czech\/wp-json\/wp\/v2\/p4-page-type?post=6444"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}