{"id":1165,"date":"2018-01-19T00:00:00","date_gmt":"2018-01-18T16:00:00","guid":{"rendered":"https:\/\/master.k8s.p4.greenpeace.org\/southeastasia\/press\/1165\/stop-waste-of-us26-billion-on-unnecessary-coal-power-projects-urges-major-new-coalition\/"},"modified":"2026-04-07T16:21:50","modified_gmt":"2026-04-07T09:21:50","slug":"stop-waste-of-us26-billion-on-unnecessary-coal-power-projects-urges-major-new-coalition","status":"publish","type":"post","link":"https:\/\/www.greenpeace.org\/southeastasia\/press\/1165\/stop-waste-of-us26-billion-on-unnecessary-coal-power-projects-urges-major-new-coalition\/","title":{"rendered":"Stop waste of US$26 billion on unnecessary coal power projects, urges major new coalition."},"content":{"rendered":"<p>Jakarta\u2013 A coalition of Indonesian NGOs, dubbed the \u2018Break Free From Coal\u2019 coalition, has called for nine planned coal power plants to be dropped from the power supply plan due to concerns around massive supply overcapacity, which would lead to substantial financial and economic loss.<\/p>\n<p>The analysis published by the coalition reveals the existing power supply plan (RUPTL 2017) has grossly overestimated demand growth and therefore has built an excess of 13 gigawatts into the Java Bali system. This would lead to a 71% surplus even at the most optimistic demand growth projections of 5% a year.<\/p>\n<p>\u201cNine planned coal power projects, amounting to 13 gigawatts, need to be cut from the power supply plan in order for Indonesia to avoid massive financial and economic loss resulting from unnecessary capacity payments to power generators,\u201d said Dwi Sawung from Friends of the Earth Indonesia (WALHI).<\/p>\n<p>This situation is worsened by the fact Indonesia\u2019s power system is heavily dependant on coal and therefore exposed to fluctuations in international coal price.<\/p>\n<p>Indonesia has set an ambitious plan to expand its electricity supply by more than 35 gigawatt in the next five years. According to the 2017 RUPTL, as much as 17 gigawatts of the stated expansion will be sourced from coal.<\/p>\n<p>The country\u2019s state-owned utility, PLN, projected a demand growth of 7% in its 2017 power supply plan, based on the forecast 7.2% economic growth rate. In contrast, electricity sales have been below target, only reaching 4.4% in the last 5 years. Last year, Indonesia\u2019s economic growth only reached 5.05%.<\/p>\n<p>The 2018 update of the power supply is due to be published in the first quarter of this year, following approval by the energy minister.<\/p>\n<p>\u201cThese projects translate into billions of wasted dollars,\u201d said Hindun Mulaika, Greenpeace Indonesia\u2019s energy and climate campaigner. \u201cThe take or pay scheme will bind PLN into paying millions of dollars to electricity that will go unused. This has been one of the causes of PLN\u2019s poor financial health.\u201d<\/p>\n<p>\u201cWe can\u2019t afford PLN to default; It will have devastating consequences for the economy. For a start, Indonesia\u2019s credit rating will be affected as it is tied to PLN\u2019s financial responsibilities. Indonesia will be forced to bail out its only utility,\u201d added Mulaika.<\/p>\n<p>PLN is a public monopoly that has been given the constitutional mandate to generate, transmit and distribute electricity. Power generation has been liberalized in recent years, allowing for private developers and operators to sell electricity to PLN. However, PLN carries the burden of paying Independent Power Producers (IPP) at capacity for the entire PPA contract period of 30 years.<\/p>\n<p>The planned coal power projects in question include two coal projects in the Banten province (Jawa 5, 2000 MW, Jawa 9&amp;10, 2000 MW), four projects in West Java province (Jawa 6, 2000MW; Cirebon 2, 1000MW; Tanjung Jati A, 1320MW; Indramayu 2, 1000MW), two projects in Central Java province (Jawa 8, 1000MW, Tanjung Jati B, 2x1000MW) and one coal power expansion project in Bali (Celukan Bawang 2, 660 MW).<\/p>\n<p>These projects are at different stages of development, some of them have obtained early permits and others have progressed past the Power Purchase Agreement (PPA). Estimated financing needs for projects is estimated to be in the realm of US$26 billion.<\/p>\n<p>\u201cThis financing is likely to be state-backed, guaranteed by a business viability guarantee. And while this might seem trivial, PLN is facing a real risk of defaulting, so in the end, tax payers will have to shoulder the financial burden of repaying these loans,\u201d said Hendrik Siregar, an energy researcher with AURIGA Nusantara.<\/p>\n<p>\u201cThis money is better off going into education and health, two sectors that have been deprived of the necessary resources.\u201d<\/p>\n<p>\u201cThe key to fixing this lies in Indonesia\u2019s energy planning. Indonesia needs to start switching from coal to renewable energy sources, particularly if it wants to comply with its climate mitigation targets under the Paris Agreement. At the moment, it looks like Indonesia is going to miss its own pre-Paris target of reducing 26% of greenhouse gas emissions with so many new planned coal power stations coming online in 2020,\u201d said Irfan Toni of 350.org Indonesia<\/p>\n<p>The Mining Advocacy Network warns of the devastating impact of coal mining to communities and to food security. \u201cThe 35 gigawatt scheme has always been about securing the domestic coal market to support the expansion of destructive coal mining in Indonesia. This needs to be stopped if Indonesia is serious about achieving food security and socio economic welfare of its people.\u201d<\/p>\n<p><strong>Media contacts:<\/strong><\/p>\n<ul>\n<li><strong>Hindun Mulaika<\/strong>, Greenpeace Indonesia, 08118407113, <a href=\"mailto:hmulaika@greenpeace.org\">hmulaika@greenpeace.org<\/a><\/li>\n<li><strong>Dwi Sawung<\/strong>, Friends of the Earth Indonesia, 0816104606, <a href=\"mailto:sawung.walhi@gmail.com\">sawung.walhi@gmail.com<\/a><\/li>\n<li><strong>Melky Nahar<\/strong>, Mining Advocacy Network, 081319789181, <a href=\"mailto:melkynahar@gmail.com\">melkynahar@gmail.com<\/a><\/li>\n<li><strong>Hendrik Siregar<\/strong>, AURIGA, 085269135520, <a href=\"mailto:beggy@auriga.org.id\">beggy@auriga.org.id<\/a><\/li>\n<li><strong>Irfan Toni H<\/strong>, 350.org Indonesia, 08129900088, <a href=\"mailto:toni@3SO.org'\">toni@3SO.org\u2019<\/a><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u2018Break Free From Coal\u2019 coalition, has called for nine planned coal power plants to be dropped from the power supply plan<\/p>\n","protected":false},"author":44,"featured_media":1864,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ep_exclude_from_search":false,"p4_og_title":"","p4_og_description":"","p4_og_image":"","p4_og_image_id":"","p4_seo_canonical_url":"","p4_campaign_name":"","p4_local_project":"","p4_basket_name":"","p4_department":"","footnotes":""},"categories":[32],"tags":[99,77],"p4-page-type":[14],"class_list":["post-1165","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy","tag-indonesia","tag-fossil-fuels","p4-page-type-press"],"_links":{"self":[{"href":"https:\/\/www.greenpeace.org\/southeastasia\/wp-json\/wp\/v2\/posts\/1165","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.greenpeace.org\/southeastasia\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.greenpeace.org\/southeastasia\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.greenpeace.org\/southeastasia\/wp-json\/wp\/v2\/users\/44"}],"replies":[{"embeddable":true,"href":"https:\/\/www.greenpeace.org\/southeastasia\/wp-json\/wp\/v2\/comments?post=1165"}],"version-history":[{"count":6,"href":"https:\/\/www.greenpeace.org\/southeastasia\/wp-json\/wp\/v2\/posts\/1165\/revisions"}],"predecessor-version":[{"id":67433,"href":"https:\/\/www.greenpeace.org\/southeastasia\/wp-json\/wp\/v2\/posts\/1165\/revisions\/67433"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.greenpeace.org\/southeastasia\/wp-json\/wp\/v2\/media\/1864"}],"wp:attachment":[{"href":"https:\/\/www.greenpeace.org\/southeastasia\/wp-json\/wp\/v2\/media?parent=1165"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.greenpeace.org\/southeastasia\/wp-json\/wp\/v2\/categories?post=1165"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.greenpeace.org\/southeastasia\/wp-json\/wp\/v2\/tags?post=1165"},{"taxonomy":"p4-page-type","embeddable":true,"href":"https:\/\/www.greenpeace.org\/southeastasia\/wp-json\/wp\/v2\/p4-page-type?post=1165"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}